Arlington Waste Water Treatment Plant Phase 7B - $240 MillionScope: Complete job stakeout include all yard piping, Foam Hood Fabrication drawings, concrete building, Piping temrateuere calculation at different intervals, interior piping coordination, Blowers – Main discharge and blowof piping and support coordination contract, construction document as built.
Client: Alberici Constructors(WWW.alberici.com)
West Secondary Service Pump Station.
Critical Structure Aeration Tank 5 &6 Lift Drawing and Construction joint detailing AWWTP, Arlington, VA. Scope: Shoring design.
Client: Araujo Construction
Site Name: BB&T Paducah Scope: Permit drawings. Site Address: 1601 Broadway St. Paducah, KY. 4001
Client: Mansai Corp/ Security vault Works, MD