Arlington Waste Water Treatment Plant Phase 7B - $240 Million
Scope: Complete job stakeout include all yard piping, Foam Hood Fabrication drawings, concrete building, Piping temrateuere calculation at different intervals, interior piping coordination, Blowers – Main discharge and blowof piping and support coordination contract, construction document as built.
Client: Alberici Constructors(WWW.alberici.com)
West Secondary Service Pump Station.
Critical Structure Aeration Tank 5 &6 Lift Drawing and Construction joint detailing AWWTP, Arlington, VA.
Site Name: BB&T Paducah
Site Name: BB&T Charleston-West Side
Scope: Permit drawings.© 2007 - 2008 Capitalsurveying.com. All Rights Reserved.